Road Construction

As you may know, the road in front of Deal’s will be widened this year.  We don’t have a firm start date yet, but the first thing scheduled is replacement of the culvert at the east corner of our property.  This stage of the construction will result in the road being closed.  During that time our western most, uphill, driveway will remain open but the eastern drive will likely be blocked with equipment.
 
Our mulch piles will be relocated.  So, mulch (and anything else we have) will still be available through the whole construction project.

Our sign will also be relocated.  Hopefully, we will be able replace it with something as close to the existing sign as possible.  Keep your fingers crossed!

We will post updates as we know more.  Keep checking back.